A Journey Through Time

1975:The journey of Indo East Corporation commenced with the trading of Pig Iron under the stewardship of our founder, Mr. Rajkumar Kejriwal, who laid the foundation of the company.

1987:A significant milestone was achieved as we transitioned into manufacturing Hamilton Poles for the Department of Telecommunication, marking our foray into the infrastructure sector. 

1995: Embarking on a new venture, we initiated the manufacturing of Telecom Towers, including Ground Based Towers (GBT), Roof Top Towers (RTT), and High Mast structures, thereby diversifying our product portfolio. 

2000: Expanding our horizons, we established Gangotri Tradelink Private Limited and ventured into laying Optical Fiber Cables using Trenchless Technology through Horizontal Directional Drilling (HDD) Machine, a testament to our commitment to innovation and technological advancement.

2001: Recognizing the need for robust infrastructure, we commenced the manufacturing and installation of Steel Channel Sleepers for Indian Railways across the country, contributing to the enhancement of railway networks.

2005: Scaling new heights, we expanded our services to include Civil Erection and Painting works for Mobile/Telecom Towers, solidifying our position as a Total Solutions Provider (TSP) in the industry. 

2010: A significant milestone was achieved as we entered the Power Sector, supplying structures for Rural Electrification and Substations. Additionally, Indo East Corporation transitioned from a proprietorship firm to a private limited company, marking a pivotal moment in our corporate journey. 

2012: Embracing renewable energy, we commenced the supply of Solar Module Mounting Structures (MMS) for Solar Projects, contributing to the nation's green energy initiatives. 

2016: We diversified our portfolio by venturing into the manufacturing of Heavy Flyover Girders, undertaking prominent projects such as the Garden Reach Flyover in Kolkata, thus bolstering infrastructure development. 

2017: Strengthening our presence in the power sector, we began supplying Power Distribution Line Hardware Items, further expanding our product offerings and market reach. 

2018: A significant investment was made with the commissioning of an in-house Hot Dip Galvanizing facility, equipped with a 7-meter kettle length, enhancing our manufacturing capabilities and ensuring quality control. 

2019: Embracing automation and technological innovation, we introduced our First Robotic Welding Machine, enhancing efficiency and precision in our manufacturing processes. 

2021: Undeterred by adversity, we embarked on a new venture by establishing ADK Pipes Pvt Ltd for manufacturing HDPE Pipes, catering to irrigation and conduit underground cables for the power sector, thus expanding our product portfolio. 

2022: In a strategic move aimed at optimizing operations and enhancing efficiency, we relocated our corporate office from Saltlake Sector V to our manufacturing facility, facilitating better management and cost reduction while minimizing communication gaps. 

2023: Keeping pace with evolving market demands, we initiated the manufacturing of Polymer Insulators, further diversifying our product offerings and strengthening our position in the industry. 

2024: As we navigate through dynamic market landscapes, Indo East is poised for growth, with the implementation of new systems and strategies, laying the groundwork for an exciting future filled with opportunities for expansion and innovation.